That must have taken a while and been quite well planned first.
Bricks look to be the same block paving as the forecourt. So either scouted and spotted a pile close by or they pulled up a section to add insult to injury.
10+ motors is at least 40 wheels, so undoing 200 wheel bolts and removing about 800kg of wheels